Click on the jamb saw below you would use to cut the bottom of the door for your flooring to slide under it it will take you directly to the page.
Trafficmaster allure ultra vinyl plank installation guide.
Install vinyl plank flooring correctly using this handy guide.
Measuring tape utility knife or vinyl cutter straight edge hand roller 75 to 100 lb.
Their basic line of flooring uses allure gripstrips while the allure lineup has boards with interlocking edges.
Surface preparation trafficmaster allure can be installed over wood or concrete subfloors even over existing vinyl or tile flooring.
Get free shipping on qualified trafficmaster allure ultra trafficmaster vinyl flooring resilient flooring or buy online pick up in store today in the flooring department.
Allure and allure plus.
Planks are 36 long.
After much hemming and hawing we finally decided to go with the ultra cool 100 water proof trafficmaster s allure ultra vinyl plank flooring.
Floor roller sharp shears for cutting around irregular objects and also a heat gun painters gun or hairdryer for reheating planks or replacing planks.
This quick start installation guide shows you how to install trafficmaster allure ultra resilient vinyl plank and tile.
All the trafficmaster allure plank flooring has a wood look and there is a large number of options in terms of style.
In terms of how install around a doorway and jamb refer to my post entitled allure ultra resilient plank flooring the click lock version you speak of.
Material needed for installation.
There are two ways to install trafficmaster allure vinyl planks or tile but both are easy and don t require anything more expensive than a razor knife so tools won t be a concern.
The room of installation must be between 65 f 85 f 10 c 38 c before during and after installation.
Most are 5 or 6 wide with a wear layer of 4 mil.
If you are installing vinyl flooring over an existing tile floor check that the grout lines are not larger than the quarter inch.
How to install vinyl plank flooring.
So we ve been working on our master bath re do for the last few weeks and we are down to the final push.
If they are the floor will need to be leveled using a patching compound.
Allure plank and tile installation instructions.
The hvac system mustbe on and functional before during and after installation.